Anyway, the school isn't the greatest looking, but the floors in my room aren't nearly as bad as I had imagined (the black area in the first picture is where the old fish pond had been once upon a time!):
And my room actually looks bigger! :) Oh, but they didn't remove the tiles in my walk-in closet. My principal thinks that they should have been, so that will have to wait until they really start the construction. My whole thought was, "You mean I could've left things in the closet and jammed other things into it????" But, I guess it was good for me to go through everything. Although it might not look horrendous, it is still concrete floors that I don't know what I am doing with. And then there is the whole thing of unpacking knowing that we will be repacking in March/April. And that I am leaving my room. And that my new room will not be nearly as nice.
The second floor is not in as good of shape. Basically, you could tell that the contractors were rushed, but there was no reason to leave floors like this (the black stuff is super sticky!):
Thankfully, they did come around and use spray adhesive to put down carpet treads on the stairs. So now there isn't as large of a trip hazard:
No comments:
Post a Comment